Automatic Train Traffic Gate Control

Code 327 Automatic Train Traffic Gate Control

4.50 out of 5
(2 customer reviews)

8,500.00 6,000.00

Ready-made Project

If You Are Short On Time
8,500.00 6,000.00
Add to cart - OR - See more options

Automatic Railway Gate Control System is a simple but very useful project, which help is automatically opening and closing the railway gate upon detecting arrival or departure of the train.In general, Railway gates are opened or closed manually by a gate keeper. The information about arrival of train for opening or closing of door is received from nearby station. But some railway crossings are totally unmanned and many railway accidents occur at these unmanned level crossings.

Kits DescriptionPrice
Ready-made Project + DIY Project Kit
If You Are An Enthusiast
Ready-made project kit, One more extra bare PCB solderable components for extra PCB, All documentation (Report, PPT, Circuit diagram, Program code, explanatory video ), Audio and video call support, and One year warranty. 9,500.00 7,500.00
Ready-made Project
If You Are Short On Time
Ready-made project kit - All documentation (Report, PPT, Circuit diagram, Program code, explanatory video ), Audio and video call support, One year warranty. 8,500.00 6,000.00
DIY Project Kit
For Institutions
DIY KIT - Bare PCB, solderable components, external all components, All documentation (Report, PPT, Circuit diagram, Program code, explanatory video ), Audio and video call support, 7,000.00 5,000.00
For Documentation
(Report, PPT, Circuit diagram, Program code, Explanatory Video). Audio call support. 3,100.00 2,000.00
For Simulation
Proteus Simulation file, Program Coad, Hex File, Explanatory Video, Google Meet Or Zoom Meet Support. 4,000.00 3,000.00

Description

Present project is designed using 8051 microcontroller to avoid railway accidents happening at unattended railway gates, if implemented in spirit. This project utilizes two powerful IR transmitters and two receivers; one pair of transmitter and receiver is fixed at up side (from where the train comes) at a level higher than a human being in exact alignment and similarly the other pair is fixed at down side of the train direction. Sensor activation time is so adjusted by calculating the time taken at a certain speed to cross at least one compartment of standard minimum size of the Indian railway. We have considered 5 seconds for this project. Sensors are fixed at 1km on both sides of the gate. We call the sensor along the train direction as ‘foreside sensor’ and the other as ‘aft side sensor’. When foreside receiver gets activated, the gate motor is turned on in one direction and the gate is closed and stays closed until the train crosses the gate and reaches aft side sensors. When aft side receiver gets activated motor turns in opposite direction and gate opens and motor stops. Buzzer will immediately sound at the fore side receiver activation and gate will close after 5 seconds, so giving time to drivers to clear gate area in order to avoid trapping between the gates and stop sound after the train has crossed.

The same principle is applied for track switching. Considering a situation wherein an express train and a local train are traveling in opposite directions on the same track; the express train is allowed to travel on the same track and the local train has to switch on to the other track. Two sensors are placed at the either sides of the junction where the track switches. If there’s a train approaching from the other side, then another sensor placed along that direction gets activated and will send an interrupt to the controller. The interrupt service routine switches the track.  Indicator lights have been provided to avoid collisions. Here the switching operation is performed using a stepper motor. Assuming that within a certain delay, the train has passed the track is switched back to its original position, allowing the first train to pass without any interruption. This concept of track switching can be applied at 1km distance from the stations.

Note

Automatic train traffic gate control system is the project of last year’s engineering project, BE final year engineering project. This project is used for BE last year electronicscore electronics, electrical department students is used. This project is sensor based project. This project is use for the school level students.

Automatic train traffic gate control system .it is a very comparative engineering project and school project. It is a very good BE electrical final year and diploma final year electrical based project.it is project for microcontroller based project idea for the electronics core electronics and electrical projects is an embedded based project.

The engineering projects give in the ELECTROSAL HI- TECH PVT.LTD. The best place for the degree and diploma final year engineering projects as well as for electronics core electronics electrical students’ final year for the golden opportunity.

Automatic train traffic gate control is an easy project and idea for the electronics, electrical degree and diploma base students & 100% output is done.

HIGHLIGHTS

  • Whenever Train Comes between 1st IR, this gives signal to microcontroller and microcontroller gives the command to Motor to close the gate.
  • Whenever Train passes to 2nd IR, this gives the signal to the microcontroller then microcontroller gives command to motor open the gate.

BLOCK DIAGRAM

HARDWARE REQUIREMENTS

  • Microcontroller
  • LCD
  • Transformer
  • L293D IC
  • Buzzer
  • Relay
  • IR Sensors
  • Motor
  • Bridge rectifier
  • Regulator

SOFTWARE REQUIREMENTS

  • Eagle
  • Keil
  • Proteus

RESOURCES

2 reviews for Automatic Train Traffic Gate Control

  1. 4 out of 5

    Amit matre

    This is best Electrical project.i ordered this project on website of electrosal.electrosal team given me a good support.thanks electrosal team for your support.

  2. 5 out of 5

    Rani male

    I have Order Do it Yourself kit of SOLAR BASED UPS project. The project having One ready made kit and another one PCB and their required components. So, i have got a great Experience. And also Practical Knowledge about this project

Add a review

Your email address will not be published. Required fields are marked *